![](https://2lux-constructions.gr/wp-content/uploads/2023/09/11-1024x1024.jpg)
MTB MINI HOTEL
The MTB HOTEL modular building system is a construction with hotel rooms that are classified in the five-star category and are highly demanded in the real estate, hotel services and business sectors.
The valuation of such buildings is always complex and time consuming for conventional constructions. For us, however, it requires a minimal amount of time to realize and construct them, compared to the above mentioned ones.
The main reference parameter of hotel facilities is always the number of floors. The aforementioned modular building and accommodation system refers to either luxury hotel rooms or staff rooms. It offers the amenities and luxury of a five-star conventional hotel at an incredibly low cost
Technical specifications
- Total surface area 20 m2
- Net floor space 33 m2
- Length 6.9 m
- Width 9.1 m
- Height 5.38 m
Extra Information
1.
- You don’t have to worry about transportation. We will take full care of the delivery of your order from the warehouses of the logistic company we work with, to any location in Greece.
- If you buy more hospitality units (panel hotels), in cooperation with our logistics department, we calculate the required loading space individually, taking into account one or more delivery addresses.
- It does not matter if it is a sea or road transport, our logistics department will take care of all procedures.
- Transport costs are calculated individually for each order and are subject to agreement between seller and buyer.
- We include all material certificates, from transport pallets to the smallest detail of the set, in the order file.
2.
- Unloading of goods. This is a stage that is usually performed by our company. The unloading date is usually known a few days in advance, so you can prepare for it.
- If you use third party installation crews, we recommend unloading with their involvement.
- The first thing to do when the transport arrives is to open the container and locate the transport pallet on which the windows are mounted. Pinned on them is a set of documents with instructions that will guide you through the whole process starting from: Health and safety, unloading the goods, checking the quantity according to the order based on the attached packing list, how to store the goods and a list of necessary tools.
- All these steps are marked step by step. In addition, online instructions with QR codes are included.
- Manual unloading takes about four hours if three people are involved in unloading.
3.
- The assembly of the house starts with the arrangement of the elements on the construction site. This stage, like every previous stage and all subsequent stages, is described in great detail in the electronic and printed instructions, which can be downloaded in full or in stages from the website.
- You do not need to worry about any fasteners such as screws or fixing foam. They are included in the basic kit and the instructions tell us where they are until the final hotel elements are assembled.
- Assembly time for the basic MTB A kit is approximately 22-30 working days. Experienced installation teams are able to complete the job in as little as 10-14 working days.
- The maximum assembly time depends on a number of factors such as bad weather, human factor, lack of haste and the proximity of the assemblers.
- For a better approximation of the installation cost, we will also mention the proposed number of people for the construction of the hotel.